this post was submitted on 30 May 2025
12 points (100.0% liked)

Aotearoa / New Zealand

1937 readers
15 users here now

Kia ora and welcome to !newzealand, a place to share and discuss anything about Aotearoa in general

Rules:

FAQ ~ NZ Community List ~ Join Matrix chatroom

 

Banner image by Bernard Spragg

Got an idea for next month's banner?

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] TagMeInSkipIGotThis@lemmy.nz 2 points 1 month ago

It would make sense in the long run but a cost of billions would cover doing something rad like making a new line running something north though Linwood, Wainoni, North New Brighton, Marshland before joining back up around Belfast. A lot of that isn't as unfeasible as it once was due to the emptying out from the earthquake near where it would need to link through.

I found an old article I read ages ago that talks more about the network:

https://talkingtransport.com/2018/11/22/flashback-when-christchurch-had-commuter-trains/

It looks like more of the paltforms have been removed than i'd hoped, but as I say they're not particularly complicated bits of engineering if you have the land.