this post was submitted on 23 May 2025
28 points (100.0% liked)

homeassistant

14315 readers
175 users here now

Home Assistant is open source home automation that puts local control and privacy first. Powered by a worldwide community of tinkerers and DIY enthusiasts. Perfect to run on a Raspberry Pi or a local server. Available for free at home-assistant.io

founded 2 years ago
MODERATORS
 

As I'm currently doing a re-wire, it's a great opportunity for me to put some metering in the house.
I'm single-phase, but I plan to monitor multiple sections of the house, which are each wired for 100A independently.

I'm currently eyeing up either the Shelly Pro 3EM – 120A or the 50A.
As it will fit nicely in the consumer unit, and supports Ethernet.

I previously looked at the Aeotec clamp devices, but they seem to be difficult to find with multiple 100A connectors.

Emporia Vue was also a consideration, but I'm always a little hesitant to buy products that require custom firmware to even work properly, when others are available. And I'd also like to avoid using 2.4Ghz wifi for connectivity.

I'd love to hear any experiences people have had with similar devices, good or bad. And how the integration with HA went.

you are viewing a single comment's thread
view the rest of the comments
[–] GreatAlbatross@feddit.uk 2 points 1 day ago (5 children)

Ah, brilliant. In that case, I may have the confirmation to make the order.

It's just a shame the 120A is so much more expensive! £70 vs £120.
As there is a low chance I'll be pulling more than 50A on a circuit, but I know it'll 100% happen one day if I cheap out!

[–] pipe01@programming.dev 1 points 23 hours ago (4 children)

Yeah the bigger toroids are quite expensive, you can always buy just the toroids by themselves later on though, I think Shelly even sells them separately

[–] GreatAlbatross@feddit.uk 2 points 22 hours ago (1 children)

Second question actually; How did you find the installation?
I'll probably get an electrician to fit, but if there are any gotchas it'd be good to know before I instruct.

[–] pipe01@programming.dev 1 points 21 hours ago

My dad is an electrician so he did it for me, from what he told me it was pretty straightforward. The easiest thing to mess up is the orientation of the toroids, which is easy to notice because the values will be negative. The 120A toroids are also kinda bulky, if your panel is on the small side it might be a bit difficult getting them in there.

load more comments (2 replies)
load more comments (2 replies)